Daftar Pengeluaran Per Tanggal
No.TanggalPembayaranHargaJumlahTotal Harga
1.2025-04-15Upah Tukang20.020.000120.020.000
2.2025-04-14Semen Tonasa 40kg69.0005345.000
3.2025-04-14Pipa 2" AW100.0001100.000
4.2025-04-14Pipa 1" AW47.000147.000
5.2025-04-14Pipa 1/2" AW27.0005135.000
6.2025-04-14Semen Tonasa 40kg68.0002136.000
7.2025-04-13Pipa 2" AW100.0002200.000
8.2025-04-12Aplus Dalam72.0002144.000
9.2025-04-12Granit 60x60 Cream145.0004580.000
10.2025-04-12Semen Tonasa 40kg68.0003204.000
11.2025-04-12Keramik 25x2580.0005400.000
12.2025-04-11Semen Tonasa 40kg69.0005345.000
13.2025-04-11Aplus Dalam72.0002144.000
14.2025-04-11Granit 60x60 Cream145.0003435.000
15.2025-04-09Keramik 25x4080.0004320.000
16.2025-04-09Keramik 25x2580.0003240.000
17.2025-04-08Besi 8 Sigma60.000160.000
18.2025-04-08Granit 60x60 Hitam255.0003765.000
19.2025-04-06Semen Tonasa 40kg69.00010690.000
20.2025-04-06Keramik 25x2575.0002150.000
21.2025-04-06Granit 60x60 Cream145.0002290.000
22.2025-04-05Keramik 25x4085.000185.000
23.2025-04-05Batu Kerikil425.0001425.000
24.2025-04-04Semen Tonasa 40kg68.000151.020.000
25.2025-04-04Keramik 25x4085.0003255.000
26.2025-04-04Pasir600.0001600.000
27.2025-03-30Upah Tukang Listrik2.600.00012.600.000
28.2025-03-28Kabel NYY 2x2,519.000595.000
29.2025-03-28Isolasi7.00017.000
30.2025-03-28Stop Kontak Non CP16.000116.000
31.2025-03-28Kabel NYA 2,512.00012144.000
32.2025-03-28Semen Tonasa 40kg68.0005340.000
33.2025-03-28Pipa 3" AW220.0001220.000
34.2025-03-28Nat Keramik27.000254.000
35.2025-03-28Granit 60x60 Cream145.000405.800.000
36.2025-03-27Saklar Single Panasonic16.000116.000
37.2025-03-27Bata Merah70020001.400.000
38.2025-03-26Isolasi7.000428.000
39.2025-03-26Stop Kontak CP20.000360.000
40.2025-03-25Aplus Dalam72.0005360.000
41.2025-03-25Kabel NYA 2,5 50m275.0001275.000
42.2025-03-25Besi 8 Sigma55.0003165.000
43.2025-03-25Keramik 25x4085.0005425.000
44.2025-03-25Upah Tukang10.000.000110.000.000
45.2025-03-24Upah Tukang Listrik1.000.00011.000.000
46.2025-03-24Kabel NYA 1,5 50m185.0002370.000
47.2025-03-24Sambungan Pipa 2"6.000530.000
48.2025-03-23Lem Pipa25.000125.000
49.2025-03-23Sambungan Pipa 3"12.500225.000
50.2025-03-23Durados Box15.000115.000
51.2025-03-23Kabel NYY 3x447.000294.000
52.2025-03-23Sekrup5.000210.000
53.2025-03-23Pipa Listrik15.000345.000
54.2025-03-23Kabel TV5.0001260.000
55.2025-03-23Lampu Megaman 20W50.0008400.000
56.2025-03-23Lampu Megaman 12W33.0004132.000
57.2025-03-23Lampu Megaman 9W25.000250.000
58.2025-03-23Lampu Megaman 3W15.0007105.000
59.2025-03-23Cuk TV50.000150.000
60.2025-03-23Lampu Megaman 12W33.000399.000
61.2025-03-20Besi 6 Sigma31.000262.000
62.2025-03-20Pipa 1/2" AW27.0005135.000
63.2025-03-20Besi 10 Sigma80.0005400.000
64.2025-03-19Keramik 25x2575.0009675.000
65.2025-03-19Keramik 25x4085.00010850.000
66.2025-03-19Pintu WC Tisson900.00021.800.000
67.2025-03-18Pasir600.0001600.000
68.2025-03-18Kitchen Sink1.000.00011.000.000
69.2025-03-18Semen Tonasa 40kg68.000251.700.000
70.2025-03-17Kloset Toto450.0002900.000
71.2025-03-17Saringan WC35.0003105.000
72.2025-03-17Pipa 3" D120.0005600.000
73.2025-03-17Pipa 2" D65.0004260.000
74.2025-03-17Roster Kaca30.00012360.000
75.2025-03-17T Dos Cabang 33.0002060.000
76.2025-03-17T Dos Cabang 43.500517.500
77.2025-03-17Klem Kabel20.000240.000
78.2025-03-17Upah Tukang7.000.00017.000.000
79.2025-03-17Pasir600.0001600.000
80.2025-03-17Kabel NYA 2,5 50m275.00041.100.000
81.2025-03-17Kabel NYA 1,5 50m185.0004740.000
82.2025-03-16Sambungan Pipa Listrik1.5004060.000
83.2025-03-15Lem Fox25.00010250.000
84.2025-03-15Aplus Dalam72.00010720.000
85.2025-03-15Semen Tonasa 40kg68.000251.700.000
86.2025-03-14Pasir600.0001600.000
87.2025-03-10Semen Tonasa 40kg68.000201.360.000
88.2025-03-09Upah Tukang Kayu1.500.00011.500.000
89.2025-03-09Upah Tukang1.000.00011.000.000
90.2025-03-09Gentong 1200L1.300.00011.300.000
91.2025-03-08Pasir600.0001600.000
92.2025-03-08Upah Tukang Kayu9.000.00019.000.000
93.2025-03-06Sekrup Spandek600200120.000
94.2025-03-03Baut Seng 2,5cm8004032.000
95.2025-03-02Paku Kalsiboard20.000120.000
96.2025-02-28Baut Seng 2,5cm8007056.000
97.2025-02-27Spandek Pj 6,8m258.4004010.336.000
98.2025-02-27Sekrup Lesplang500250125.000
99.2025-02-27Sekrup Spandek6001000600.000
100.2025-02-27Papan Lesplang 30cm75.000151.125.000
101.2025-02-27Seng Plat Talang30.000451.350.000
102.2025-02-27Spandek Pj 3,3m125.4005627.000
103.2025-02-25Baut Kc 19 Panjang 17cm8.50025212.500
104.2025-02-25Paku 520.000120.000
105.2025-02-25Paku 720.000360.000
106.2025-02-23Upah Tukang Kayu6.000.00016.000.000
107.2025-02-22Baut Kc 19 Panjang 17cm8.50012102.000
108.2025-02-20Baut Kc 19 Panjang 12cm7.5001075.000
109.2025-02-20Baut Kc 19 Panjang 17cm8.50016136.000
110.2025-02-19Baut Kc 19 Panjang 11cm13.000565.000
111.2025-02-18Baut Kc 19 Panjang 15cm14.500572.500
112.2025-02-18Baut Kc 19 Panjang 17cm8.5001085.000
113.2025-02-18Baut Kc 19 Panjang 20cm9.000436.000
114.2025-02-17Bohlam Megaman 30W70.000170.000
115.2025-02-17Paku 1020.000240.000
116.2025-02-17Paku 720.0005100.000
117.2025-02-17Paku 520.000120.000
118.2025-02-13Balok 5x10 6m Kumea234.0005011.700.000
119.2025-02-13Balok 5x10 4m Meranti80.000907.200.000
120.2025-01-26Pasang Listrik 900VA1.123.00011.123.000
121.2025-01-10Upah Tukang8.900.00018.900.000
122.2025-01-10Upah Cor Molen2.000.00012.000.000
123.2025-01-09Batu Kerikil850.0001850.000
124.2025-01-09Pipa 1" AW47.000147.000
125.2025-01-09Pipa 3" D120.0001120.000
126.2025-01-09Semen Tonasa 40kg68.000755.100.000
127.2025-01-08Bambu30.0005150.000
128.2025-01-05Pasir600.0001600.000
129.2025-01-05Batu Kerikil1.300.00011.300.000
130.2025-01-05Balok 5x5 4m Jati Putih25.0005125.000
131.2025-01-05Paku 520.000240.000
132.2025-01-03Besi 10 Sigma80.000645.120.000
133.2025-01-03Besi 6 Sigma31.0004124.000
134.2025-01-03Pipa Listrik15.000345.000
135.2025-01-03Pipa 2" AW100.0001100.000
136.2025-01-03T Dos Pipa Listrik4.000624.000
137.2025-01-03Knee Pipa Listrik1.00055.000
138.2025-01-03Sambungan Pipa 2"3.00013.000
139.2025-01-03Lakban Coklat20.000120.000
140.2024-12-28Papan 20cm 4m Jati Putih42.00010420.000
141.2024-12-28Bambu30.00015450.000
142.2024-12-27Bambu30.00030900.000
143.2024-12-25Bata Merah65022001.430.000
144.2024-12-25Paku 520.000120.000
145.2024-12-25Paku 412.000112.000
146.2024-12-24Kawat Pengikat130.0001130.000
147.2024-12-16Pasir600.0001600.000
148.2024-12-15Pasang air PAM2.500.00012.500.000
149.2024-12-14Token Listrik103.0001103.000
150.2024-12-14Paku Kalisboard10.000110.000
151.2024-12-14Tripleks 9mm90.000151.350.000
152.2024-12-14Semen Tonasa 40kg68.000151.020.000
153.2024-12-14Besi 6 Sigma31.0009279.000
154.2024-12-14Balok 3x5 4m Jati Putih15.00010150.000
155.2024-12-14Balok 5x5 4m Jati Putih25.000471.175.000
156.2024-12-14Papan 20cm 4m Jati Putih42.00015630.000
157.2024-12-13Besi 10 Sigma80.000504.000.000
158.2024-12-13Besi 6 Sigma31.0009279.000
159.2024-12-13Besi 8 Sigma55.0002110.000
160.2024-12-13Upah Tukang5.000.00015.000.000
161.2024-12-09Roster Uk 25x2520.000360.000
162.2024-12-04Balok 3x5 4m Jati Putih15.000230.000
163.2024-12-02Semen Tonasa 40kg68.000201.360.000
164.2024-11-29Upah Tukang5.000.00015.000.000
165.2024-11-26Paku 520.000240.000
166.2024-11-25Bata Merah63073004.599.000
167.2024-11-20Bambu35.00010350.000
168.2024-11-18Roster Uk 15x5020.00015300.000
169.2024-11-18Roster Uk 15x4015.00021315.000
170.2024-11-18Roster Uk 25x2520.00048960.000
171.2024-11-16Semen Tonasa 40kg68.000302.040.000
172.2024-11-16Pasir550.0001550.000
173.2024-11-16Upah Tukang5.000.00015.000.000
174.2024-11-15Papan 20cm 4m Jati Putih42.00010420.000
175.2024-11-13Besi 10 Sigma80.000302.400.000
176.2024-11-13Kawat Pengikat140.0001140.000
177.2024-11-05Batu Kerikil1.200.00011.200.000
178.2024-11-05Semen Tonasa 40kg68.000151.020.000
179.2024-11-03Upah Tukang5.000.00015.000.000
180.2024-10-30Timbunan250.0001250.000
181.2024-10-30Semen Tonasa 40kg68.000151.020.000
182.2024-10-28Paku 710.000110.000
183.2024-10-27Bambu30.00015450.000
184.2024-10-25Paku 525.000125.000
185.2024-10-25Kawat Pengikat130.0001130.000
186.2024-10-24Upah Tukang5.000.00015.000.000
187.2024-10-23Ember Cor25.000250.000
188.2024-10-22Semen Tonasa 40kg68.000151.020.000
189.2024-10-21Pasir550.0001550.000
190.2024-10-20Baskom25.000250.000
191.2024-10-18Besi 10 Sigma80.000302.400.000
192.2024-10-16Token Listrik103.0001103.000
193.2024-10-16Kawat Pengikat140.0001140.000
194.2024-10-16Besi 6 Sigma31.00030930.000
195.2024-10-16Bata Merah63085005.355.000
196.2024-10-14Besi 6 Sigma31.00015465.000
197.2024-10-14Besi 10 Sigma80.000302.400.000
198.2024-10-14Semen Tonasa 40kg68.00010680.000
199.2024-10-13Bata Merah63085005.355.000
200.2024-10-12Sewa Mobil Pengantar Kusen1.000.00011.000.000
201.2024-10-05Timbunan250.0004010.000.000
202.2024-09-21Upah Tukang8.000.00018.000.000
203.2024-09-21Semen Tonasa 40kg67.0005335.000
204.2024-09-19Semen Tonasa 40kg67.00013871.000
205.2024-09-14Pasir500.0001500.000
206.2024-09-13Papan 20cm 4m Jati Putih42.00020840.000
207.2024-09-12Paku 525.000250.000
208.2024-09-12Kawat Pengikat140.0001140.000
209.2024-09-11Upah Tukang5.000.00015.000.000
210.2024-09-11Batu Pondasi550.0001550.000
211.2024-09-10Semen Tonasa 40kg67.000251.675.000
212.2024-09-06Pasir500.0001500.000
213.2024-09-05Batu Pondasi550.0001550.000
214.2024-09-04Bayar Listrik Air200.0001200.000
215.2024-09-03Batu Pondasi550.0001550.000
216.2024-09-02Semen Tonasa 40kg67.000302.010.000
217.2024-09-01Pasir500.0001500.000
218.2024-09-01Batu Pondasi550.00021.100.000
219.2024-08-30Upah Tukang5.000.00015.000.000
220.2024-08-29Semen Tonasa 40kg67.000302.010.000
221.2024-08-28Batu Pondasi550.0001550.000
222.2024-08-28Selang 5/8 Milliard 1 Roll300.0001300.000
223.2024-08-26Pasir500.0001500.000
224.2024-08-25Ember Cor15.000230.000
225.2024-08-24Semen Tonasa 40kg67.000302.010.000
226.2024-08-24Token Listrik103.0001103.000
227.2024-08-23Batu Pondasi550.00021.100.000
228.2024-08-22Besi 6 Sigma31.00025775.000
229.2024-08-22Besi 10 Sigma80.000504.000.000
230.2024-08-22Pasir500.0001500.000
231.2024-08-21Batu Pondasi550.0001550.000
232.2024-08-21Selang 5/8 Milliard7.00020140.000
233.2024-08-21Semen Tonasa 40kg67.000302.010.000
234.2024-08-20Batu Pondasi550.0001550.000
235.2024-08-20Upah Tukang5.500.00015.500.000
236.2024-08-20Pasir500.0001500.000
237.2024-08-17Semen Tonasa 40kg67.000302.010.000
238.2024-08-16Batu Pondasi550.00021.100.000
239.2024-08-16Pasir500.0001500.000
240.2024-08-15Ember Cor15.000230.000
241.2024-08-15Ember Cor Besar20.000120.000
242.2024-08-15Batu Pondasi550.0001550.000
243.2024-08-15Batu Kerikil1.400.00011.400.000
244.2024-08-13Ember Cor Besar20.000240.000
245.2024-08-13Batu Pondasi550.00021.100.000
246.2024-08-13Pasir500.00021.000.000
247.2024-08-13Ember Cor15.000460.000
248.2024-08-12Besi 10 Sigma80.000302.400.000
249.2024-08-12Besi 6 Sigma31.00020620.000
250.2024-08-12Kawat Pengikat150.0001150.000
251.2024-08-10Semen Tonasa 40kg67.000503.350.000
252.2024-08-07Paku 524.000124.000
253.2024-08-07Balok 3x5 4m Jati Putih15.000575.000
254.2024-08-07Balok 5x5 4m Jati Putih25.00010250.000
Total Pengeluaran308.838.500